Please note that these drawings include all revisions so please check for current versions
- 1309 Drawing Issue Register
- 1309 Valleys Family Church, Calcs p1-p40
- Standard Notes Structural Mods 1309-000
- Existing Foundation Survey 1309-001
- Existing Foundation Survey- Sections 1309-002
- Proposed Foundation Plan- Option B 1309-200
- Proposed Foundation Plan 1309-200C
- Proposed First Floor Steelwork- Option B 1309-201
- Proposed First Floor Steelwork 1309-201A
- Proposed Ground Floor Plan (with steelwork underside first floor) 1309-201B
- Proposed Foundation Sections – Option B 1309-202
- Proposed Foundation Sections 1309-202A
- Proposed Foundation Sections 1309-202B
- Proposed Foundation Sections – Option B 1309-203
- Proposed Foundation Sections 1309-203A
- Proposed Foundation Sections 1309-203B
- Proposed Foundation Sections – Option B 1309-204
- Proposed First Floor Sections 1309-204A
- Proposed First Floor Sections 1309-204B
- Proposed First Floor Sections 1309-204C
- Proposed Mini Pile Layout 1309-205
- Proposed Mini Pile Layout 1309-205A
- Proposed Piling Foundation Plan 1309-205B
- Proposed Piling Scheme Section A-A 1309-206
- Proposed Piling Scheme Section A-A A1309-206A
- Proposed Piling and Basement Slab 1309-207
- Proposed Stairs Sections B-B and C-C 1309-208
- Helifix-Principles-Products-Applications_LR
- PIS CemTie